| 1 | India (northern, eastern and north-eastern grids), 31 July 2012 | 620 | 31 Jul 2012 | About 1–2 days to restore | India | Cascading grid failure | Reports range from 600 to about 670 million; the day before, 30 Jul, hit about 370–400 million. An inquiry found no cyberattack.[2] |
| 2 | Pakistan (nationwide), 23 January 2023 | 220 | 23 Jan 2023 | 12–13 hours in most regions | Pakistan | Operating or planning error | CNN’s “nearly 220 million”; our list’s other source says 244 million (99% of the population).[3][1] |
| 3 | Pakistan (all provinces), 24 January 2015 | 140 | 24 Jan 2015 | Not stated (officials expected about 8 hours) | Pakistan | Disputed or unclear | Media estimate from about 80% of the country losing power; the cause was disputed (militant attack vs a failed line).[4][5] |
| 4 | Bangladesh (nationwide), 4 October 2022 | 130 | 4 Oct 2022 | Several hours | Bangladesh | Cascading grid failure | “At least 130 million” per the Power Development Board; the cause was still under investigation that day.[6] |
| 5 | Bangladesh (nationwide), 1 November 2014 | 100 | 1 Nov 2014 | About 10 hours | Bangladesh | Equipment or protection fault | The Daily Star says about 100 million of 160 million; some outlets and our other list say 150 million.[7][1] |
| 6 | Brazil (south-east, centre-west, south), 11 March 1999 | 86 | 11 Mar 1999 | Hours (power began returning near midnight) | Brazil | Weather or lightning | Midpoint of a reported 75–97 million range; the sources do not say which figure came from which source.[10] |
| 7 | Turkey (almost all provinces), 31 March 2015 | 76 | 31 Mar 2015 | About 8 hours | Turkey | Cascading grid failure | 76 million is the whole population (Hürriyet headline), so this is an upper bound; deaths unknown.[11] |
| 8 | Brazil and Paraguay, 10 November 2009 | 60 | 10 Nov 2009 | About 4.5 hours in São Paulo; 20 minutes in Paraguay | Brazil and Paraguay | Weather or lightning | 60 million in Brazil (AP, 18 states); Paraguay was blacked out too but no headcount is given.[12] |
| 9 | Italy (and part of Switzerland), 28 September 2003 | 56 | 28 Sep 2003 | About 12 hours | Italy | Cascading grid failure | About 56 million; part of Switzerland near Geneva was dark for about 3 hours.[14] |
| 10 | United States and Canada (Northeast), 14 August 2003 | 55 | 14 Aug 2003 | About 2 hours to 4 days, by place | United States and Canada | Operating or planning error | About 45 million in eight US states and 10 million in Ontario; city tallies lack citations.[15] |
| 10 | Spain and Portugal (Iberian Peninsula), 28 April 2025 | 55 | 28 Apr 2025 | About 10 hours | Spain and Portugal | Cascading grid failure | About 55 million in our list; AP-type counts of 50–60 million are population figures, not meter counts.[16][1] |
| 12 | Brazil (eight north-eastern states), 4 February 2011 | 53 | 4 Feb 2011 | A few hours (mostly restored by 8 a.m.) | Brazil | Equipment or protection fault | MercoPress’s “estimated 53 million”; early reports said only 10–13 million.[13] |
| 13 | Argentina, Uruguay and Paraguay, 16 June 2019 | 48 | 16 Jun 2019 | About a day (98% of Argentina back by evening) | Argentina and Uruguay | Operating or planning error | An estimate (Bloomberg, Business Insider); about 50 million by another count. No final official conclusion is reported.[17] |
| 14 | Venezuela (most of 23 states), 7 March 2019 | 30 | 7 Mar 2019 | About a week, patchy | Venezuela | Disputed or unclear | About 30 million is Venezuela’s population, not a count; no source gives one. Treat as an upper-bound estimate.[18] |